Download Angola : towards an energy strategy by International Energy Agency PDF

By International Energy Agency

On the request of the Angolan govt in 2005, the IEA performed a survey of the Angolan power area and effort rules. This ensuing document on Angola makes a speciality of components for precedence motion and hones in on strength subsectors prone to play the biggest position in assembly family call for for contemporary strength providers: particularly electrical energy and oil items. As biomass at the moment performs an important position in assembly the bulk  Read more...

Show description

Read Online or Download Angola : towards an energy strategy PDF

Best strategy books

Implementing the IT Balanced Scorecard: Aligning IT with Corporate Strategy

The pursuits of an IT balanced scorecard comprise the alignment of IT plans with enterprise targets, the institution of measures of IT effectiveness, the directing of worker efforts towards IT goals, the enhanced functionality of expertise, and the fulfillment of balanced effects throughout stakeholder teams.

The anatomy of victory: battle tactics 1689-1763

The years 1689-1763 have been years of transition within the army technological know-how. Many books were written in regards to the battles of that interval, yet few inform how the warriors truly fought these battles utilizing the guns to hand. This booklet does. Painstakingly researched, and utilizing real battles for representation, it tells the reader the "how" and "why" concerning the strategies utilized by infantry, cavalry and artillery.

Additional info for Angola : towards an energy strategy

Sample text

Based on lessons learned from earlier efforts, the British Embassy feels that future projects it is considering together with BP may be able to halve installation costs. It is unclear how much private solar PV capacity exists in the country. 5%. Hydropower potential of Angola’s major river basins Basin area (Km2) Potential capacity (MW) Potential capacity (GWh) Installed capacity (MW) 147 738 8 199 34 746 458 Longa 23 320 1 190 4 796 0% Queve 23 000 3 020 11 786 0% N’Gunza, Quicombo, Evale and Balombo 17 270 1 086 3 488 0% Catumbela 16 640 1 930 10 660 49 3% Cunene 128 600 2 492 6 225 41 2% Cubango 148 860 350 592 505 428 18 267 72 293 Kwanza Total Installed as % of potential 6% 0% 548 3% Source: data from Estratégia de Desenvolvimento do Sector Eléctrico de Angola (2002).

According to the 1996 Electricity Act, concessions, which apparently are exclusive, are required in cases where capacity is greater than 1 MW or the relevant town contains over 50 000 inhabitants. In all other cases an (apparently non-exclusive) license from the local authority is required. However, PPIAF and World Bank (2005) point out that Law 5/02, which supposedly supersedes the Electricity Act, effectively requires all electricity distribution schemes – no matter how small – to be operated as a concession.

In 1998 ENE was transformed into a “public entity”, giving it a legal status separate from that of the government. ■ Empresa de Distribuição de Electricidade (EDEL) is the state-owned distribution 6. It does not operate in the remote Zaire, Cuando Cubango or Lunda Norte provinces, where rudimentary service is provided by a few municipal authorities. © OECD/IEA, 2006 company responsible for electricity supply in the capital city of Luanda. Approximately 80% of its customer base is residential. It purchases all of its electricity from ENE, and like ENE has “public entity” status.

Download PDF sample